Newton Court

Sector:

The Representative Church of Wales

Scope:

CAT A Industrial

The warehouse premises had been subject to an extensive internal build to accommodate a secure cash handling centre. Including the removal of a 100m3 safe, over 1000 tons of blockwork, steel and concrete had to be removed to open the space back to its original layout. 

CAT A
Dartford
  • Project explanation

    An extensive internal warehouse build.

    The warehouse premises had been subject to an extensive internal build to accommodate a secure cash handling centre. Including the removal of a 100m3 safe, over 1000 tons of blockwork, steel and concrete had to be removed to open the space back to its original layout.

    Internal construction works included:

    • Creation of new air-conditioned reception and office spaces
    • New washrooms
    • New main and sub distribution boards
    • Warehouse lighting
    • Replacement of roller-shutter doors
    • Flowcrete industrial flooring
    • Smoke detection
    • Elevator refurbishment

    External works included:

    • Reconfiguration of fencing and entrances
    • Block paving to car parks
    • Delcote systems to roof and gutters with single point warranties secured
    • Spraying to cladding
    • Replacement windows

    Completion Date:

    2019

    Location:

    Dartford

    Duration:

    5 months

    Fit Out:

    CAT A