Chaston House, Great Shelford

Sector:

Office (Landlord)

Scope:

CAT A refurbishment

BC Workspace were instructed by the building surveyors Hollis to carry out the full refurbishment of the vacant office building, Chaston House, in Great Shelford, Cambridgeshire.

CAT A
Great Shelford, Cambridgeshire

Project explanation

CAT A landlord refurbishment

Works included:

  • Strip-out
  • Installation of new Velux windows to the 2nd floor
  • Suspended ceilings throughout
  • Decoration
  • Flooring throughout
  • Refurbishment of washrooms and shower rooms
  • Installation of new lighting system inc. daylight sensors
  • Installation of new fire alarm system
  • Installation of PV panels to the roof
  • Installation of EV car charging points
  • Installation of new incoming power and switchgear
  • Installation of new ventilation and HVAC system
  • External spraying of windows and brise soleil
  • Reconfiguration of existing curtain walling and installation of new entrance doors
  • External re-landscaping
  • White-lining to car-park

Completion Date:

December 2022

Location:

Great Shelford, Cambridgeshire

Duration:

24 weeks

Fit Out:

CAT A

other Projects

drag or swipe to scroll

Ready to discuss a project?

2025 BC Workspace. All Rights Reserved.
Created by
twitterinstagrampinterest-parrow-right